Skip To Main Content

Home

Our Mission

About Us

Our mission is educate, inspire and empower our diverse learners, to shape their futures, to accomplish their dreams and to contribute positively to our local and global communities.

RMS has construction happening over the summer. Because of that, the building and offices will be closed and most spaces will be closed to the public. We will not be doing any tours until scheduled events in August. Office staff will most likely be working from other District 728 buildings until August 18. If you are a new family that needs to register, please visit our ISD 728 Enrollment Page to get enrolled.

  1. Gym Access - There will be limited access for the gyms via sessions registered through community education/facilities. Entry will only be through Door I. Additionally, exterior and indoor gym doors are being replaced, which may impact activities.  
  2. Parking Lots - The front parking lot will be fenced off and will have no access to the building or parking lot. The back parking lot will be available for the public to use for tennis and pickleball courts. Do not park on the grass or sidewalks. 
  3. 6th Grade Summer Band Lessons - Location is Rogers High School from August 11-22. Specific times shared by the instructor for each instrument.

Summer 2025 Construction Plans at RMS

Because of student growth and needed updates to the building, the following projects are scheduled to be completed between June 9 and before school starts.

  1. Two Classrooms Added - locker bays in Houses A and B will be reconfigured into classrooms. One will be a science classroom complete with water and lab stations. The other will be a regular classroom. 
  2. Two Flexible Spaces Added - parts of House A and B hallway/locker areas will be reconfigured into flexible learning spaces for students and staff. 
  3. Locker movement - because of the renovations, lockers will be moved to other parts of the building 
  4. Walls- Some of our classrooms have demountable, or moveable walls. Several will be replaced with sheetrock walls. These changes are to make acoustic improvements and bring the walls in line with District standards to remove operable walls. 
  5. Carpet Replacement - the media center and both the choir and band rooms will have the carpet replaced. The media center will also have new paint. 
  6. Single Doors Switched to Double Doors- Two locations will have their Single door reconfigured into a double door for ease of traffic flow. These are entrances to House A and House B. 
  7. ADA Accessible bathroom - Will be added to an existing Special Education Classroom 

LINK to slideshow 

Quick Links

District News & Events

Rogers Pride!